
Tesla and BOXT: the UK solar package with Powerwall 3
An archive look at the May 2026 UK solar and Powerwall 3 package: deposit, monthly payments and the equipment included.
Notizie e approfondimenti, dal più recente al più vecchio.
307 articoli
An archive look at the May 2026 UK solar and Powerwall 3 package: deposit, monthly payments and the equipment included.

The May 2026 move towards subscriptions, the dates and prices reported at the time and why payment terms were separate from driving…

An archive look at Low Cost Charging references found in app version 4.56.5, distinguishing development clues from general availability.

Tesla’s May 2026 Basecharger announcement outlined 125 kW depot charging for the Semi, with integrated power electronics and shared electrical capacity.

The first Semi from Tesla’s new high-volume line marked a production milestone in April 2026, distinct from reaching full output or fleet…

The reported limits of Tesla’s older hardware, proposed retrofit work and the details that had not become a confirmed customer offer.

An archive report on Spanish testing, institutional interest in Italy and the remaining approval requirements for supervised FSD.

Pet Mode customisation, Grok wake-word support, updated visualisations, overnight software installation and Dashcam changes in Tesla 2026.14. Availability varied by hardware and…

FSD v14.3 development, April 2026 Dutch permission and other reported software features, with market and hardware limits kept clear.

Model 3 scored 804 and Model Y 797 in the US EV ownership study, while 96% of BEV owners would consider another…

An archive look at Tesla’s April 2026 milestone in Saint-Saturnin, with the distinction between charging stalls and locations.

The April 2026 discussion of physical controls and yoke steering wheels, with draft requirements kept separate from final law.